Why this wireframe works | Swimlane steps
Our work and yours, side by side at each stage
When tasks are mixed into one paragraph, nobody can tell who does what. Each stage puts our work and the client’s work in separate columns.
“To do” labels mark the client’s tasks
Column position or color alone does not tell everyone which tasks are the client’s. Each client task starts with a “To do” text label.
The client’s tasks can be highlighted
Some readers only want to check what they need to prepare. The “Highlight your tasks” button darkens the client’s tasks and fades ours.
The change is announced
Shading is lost on people who cannot see it. The button shows its pressed state with aria-pressed, and the change is announced to screen readers.
On mobile, each stage stacks
A three-column table on mobile is unreadable. On mobile each stage stacks with “Us” and “You” labels.
Common mistakes | Swimlane steps
The client’s tasks are missing
When only our work is listed, clients do not know what to prepare and the project slips. Write the client’s tasks at each stage.
Vague wording such as “We appreciate your cooperation”
Wording that does not say what to do means preparation never starts. Write it as “Prepare the copy and photos”, with a deadline where possible.
Roles shown only by color or position
Column color or position alone does not convey roles to screen reader users or in print. Use text labels such as “To do” as well.
Client tasks with no deadline
“Prepare the copy” alone does not say when it is needed. Add a deadline or guide such as “before the build starts”, and ask for things that take time at a stage before the build.
So many tasks the table cannot be read
Listing every small task makes the table long and buries the important ones. List only the main tasks and move detail to another page or an expandable section.
FAQ | Swimlane steps
How many client tasks should be listed?
One or two per stage, limited to the main ones, keeps it readable. Smaller tasks can go in an expanded stage or on another page.
Do our own tasks need to be listed too?
Listing them shows the client what is happening while they wait, which reduces worry, and shows how the two sides’ tasks relate. Leave out the detail and list the main tasks.
Can it be prose instead of a table?
Prose works, but the division of roles becomes harder to read. A table makes it easy to compare our work and the client’s at each stage. Write the headings as th elements so the column meanings are conveyed.
Is “Highlight your tasks” necessary?
Not required, but useful for readers who only want to check what to prepare. If you add it, show the pressed state with aria-pressed and announce the change to screen readers.





















