Why this wireframe works | Steps with durations
The overall duration and the stages are visible
“About 10 weeks” alone does not say which stage is long. Bars on a weekly scale show the total length and where the time goes.
Bar durations are written as text too
A chart alone does not convey durations to screen reader users or people who want to check the figures. Under each stage name, the time taken and the position on the scale are written separately as text, such as “About 3 weeks / weeks 3–5”.
Switch conditions to see how the duration changes
Some stages get shorter when copy and photos are ready in advance. Switching between “Standard” and “Copy and photos ready in advance” changes the total and the bars.
The new total is announced after switching
A change in the bars does not reach people who cannot see it. The switch buttons show their pressed state, and “Switched to about 7 weeks in total” is announced.
On mobile, the weekly scale stacks too
Shrinking a wide chart on mobile makes the text unreadable. On mobile the stage name sits above its bar, with the weekly scale at full width.
Common mistakes | Steps with durations
Bars only, with no durations in text
Bar lengths alone do not give exact durations, and they do not reach screen readers. Write each stage’s duration as text too.
A short duration shown large with no conditions
“As little as 4 weeks” in large type leads to disagreement with the real duration. State what must be true for that duration, right beside the figure.
Vague switch conditions
A switch between “fast” and “slow” does not tell readers which applies to them. Use conditions readers can judge, such as “Copy and photos ready in advance”.
Charting durations you cannot keep
A chart makes durations look like promises. Chart only what you can deliver, always show that they are planned or approximate right next to the chart, and state what makes them vary.
A scale too fine to read on mobile
Twelve fine divisions overlap on mobile. Thin the scale or use months, keeping a readable size.
FAQ | Steps with durations
Days, weeks or months?
Match the length of the stages. For a process of days to months, weeks are easiest. Use days if the whole thing takes days, and months if it takes half a year or more.
Can the bar chart be an image?
An image cannot be read as text and may look rough when enlarged. Build it in HTML and CSS and write each stage’s duration as text.
What conditions should the switch use?
Conditions on the client’s side that affect the duration a lot: whether copy and photos are ready, whether there are few review rounds. Keep your own circumstances out of the switch and inside the range of the estimate.
Should delays be mentioned?
Stating what makes durations vary helps readers understand the situation. There is no need to say what happens after a delay of so many days, but the possibility of variation should not be hidden.