Skip to main content

BETANow in public beta.Public betaBeta

日本語Español

STEP-003 Published

Steps with durations

A design that lays out the stages of a process as horizontal bars on a weekly scale, showing the overall duration and how stages overlap.

FigmaThis part is included in our free, editable Figma file: 235 website UI patterns across 32 parts, 2 designs each Open in Figma Community ↗ (opens in a new tab)

Wireframe (desktop) | Steps with durations

Steps with durations UI design (desktop wireframe)

Wireframe (mobile) | Steps with durations

Steps with durations UI design (mobile wireframe)

What changes on mobile

  1. Name above, bar below: Side by side both the name and the bar are cramped, so they stack.
  2. Full-width weekly scale: The bars line up with the weeks at the same width so positions can be read.
  3. Switch may wrap: The condition labels are long, so they are not forced onto one line.

Before you choose this pattern | Steps with durations

Good fit

  • You want to show visually how long the whole process takes
  • Each stage's duration can be explained in weeks
  • You want to be honest that the duration depends on conditions
  • Website projects, renovation, professional procedures: fields where duration is part of the decision

Poor fit

  • Durations vary so much by project that no guide can be given (leave durations out and show only the order with the <a href="/patterns/en/step-horizontal/">horizontal steps</a> or <a href="/patterns/en/step-vertical/">vertical timeline steps</a>)
  • You want readers to understand the order and content first (the <a href="/patterns/en/step-horizontal/">horizontal steps</a> work better)
  • You want to separate your work from the client's (the <a href="/patterns/en/step-swimlane/">swimlane steps</a> work better)

Why this wireframe works | Steps with durations

The overall duration and the stages are visible

“About 10 weeks” alone does not say which stage is long. Bars on a weekly scale show the total length and where the time goes.

Bar durations are written as text too

A chart alone does not convey durations to screen reader users or people who want to check the figures. Under each stage name, the time taken and the position on the scale are written separately as text, such as “About 3 weeks / weeks 3–5”.

Switch conditions to see how the duration changes

Some stages get shorter when copy and photos are ready in advance. Switching between “Standard” and “Copy and photos ready in advance” changes the total and the bars.

The new total is announced after switching

A change in the bars does not reach people who cannot see it. The switch buttons show their pressed state, and “Switched to about 7 weeks in total” is announced.

On mobile, the weekly scale stacks too

Shrinking a wide chart on mobile makes the text unreadable. On mobile the stage name sits above its bar, with the weekly scale at full width.

Common mistakes | Steps with durations

Bars only, with no durations in text

Bar lengths alone do not give exact durations, and they do not reach screen readers. Write each stage’s duration as text too.

A short duration shown large with no conditions

“As little as 4 weeks” in large type leads to disagreement with the real duration. State what must be true for that duration, right beside the figure.

Vague switch conditions

A switch between “fast” and “slow” does not tell readers which applies to them. Use conditions readers can judge, such as “Copy and photos ready in advance”.

Charting durations you cannot keep

A chart makes durations look like promises. Chart only what you can deliver, always show that they are planned or approximate right next to the chart, and state what makes them vary.

A scale too fine to read on mobile

Twelve fine divisions overlap on mobile. Thin the scale or use months, keeping a readable size.

FAQ | Steps with durations

Days, weeks or months?

Match the length of the stages. For a process of days to months, weeks are easiest. Use days if the whole thing takes days, and months if it takes half a year or more.

Can the bar chart be an image?

An image cannot be read as text and may look rough when enlarged. Build it in HTML and CSS and write each stage’s duration as text.

What conditions should the switch use?

Conditions on the client’s side that affect the duration a lot: whether copy and photos are ready, whether there are few review rounds. Keep your own circumstances out of the switch and inside the range of the estimate.

Should delays be mentioned?

Stating what makes durations vary helps readers understand the situation. There is no need to say what happens after a delay of so many days, but the possibility of variation should not be hidden.

Related pages

Share this pattern

Send this page to your team or your design partner.

Was this pattern useful?

Written by

Yuta Okano

ENVY DESIGN Inc.

CEO / Director / Designer

14 years in the web industry. Has worked on more than 500 web projects, from corporate and recruiting sites to e-commerce. Focuses on information architecture, direction and design, from planning websites to improving them. In recent years he has focused on AIO (AI optimization) and GEO, helping sites get cited by generative AI search such as ChatGPT, Perplexity and Google AI Overviews.

Review and revision history

  1. Published AvatarYuta Okano Pattern published